MeTop.ai

Photovoltaic and new energy solutions

Supported by 3D data
New energy project construction and operation and maintenance

Record photovoltaic sites, wind power facilities and construction progress through drone images, photos and point clouds.

Photovoltaic and new energy credible 3D reconstruction applications

Photovoltaics and new energy / TRUSTWORTHY SPATIAL INTELLIGENCE

Rapid collection by drone

Covering a wide range of sites and construction areas.

stage reconstruction comparison

Save project and operation and maintenance status by time.

Equipment location labeling

Associated components, inverters and risk points.

Get plan

Start with a real project.

Project focus

Common difficulties in photovoltaic and new energy projects

Organize scattered photos, drawings and field records into three-dimensional data that can be viewed, reviewed and continued to be used.

01

Large site area

Manual inspection and data compilation are time-consuming.

02

The construction phase changes rapidly

It is difficult to align progress and problems at different times.

03

Many equipment points

It is difficult for photos and records to correspond to the actual location.

solution capability

Build usable outcomes around real spaces

From collection, reconstruction to viewing and delivery, a workflow suitable for actual business is formed.

Photovoltaic and new energy - rapid collection by drone

Form real 3D data that can be used continuously

Aviation procurement

Rapid collection by drone

Covering a wide range of sites and construction areas.

Photovoltaics and new energy – phased reconstruction comparison

Make key spatial relationships and object details visible

Contrast

stage reconstruction comparison

Save project and operation and maintenance status by time.

Photovoltaics and New Energy - Equipment Location Marking

Reduce duplicate attendance, rework and data verification

point

Equipment location labeling

Associated components, inverters and risk points.

Photovoltaics and New Energy - Area and Distance Review

Support cross-team viewing, measurement, annotation and review

Measure

Area and distance review

Complete basic spatial measurements online.

Photovoltaic and new energy - remote inspection collaboration

Precipitated into a 3D archive of the project that can be updated continuously

Inspection

Remote inspection collaboration

Reduce unnecessary duplication.

Implementation process

Pilot and go-live steps

01

Determine objects and purposes

Clarify the collection scope, data boundaries, results usage and acceptance requirements.

02

Collect and complete reconstruction

Build trustworthy 3D results using photos, videos, drones or point cloud data.

03

Review and access business

Complete viewing, measurement, annotation, sharing or enterprise system access.

Delivery content

What does the plan include?

The specific delivery scope will be confirmed based on the project objects, data conditions, usage methods and deployment requirements.

01

Project collection and data compilation specifications

02

Trustworthy 3D reconstruction results

03

Online viewing, measurement and annotation configuration

04

Project review and delivery information

05

Suggestions for batch launch or system access

Customer Stories

Supplement step by step from real projects

The following locations are used to present project background, implementation process, 3D outcomes, and quantifiable business results.

Photovoltaic and new energy application scenarios - photovoltaic stations

Application scenarios

Photovoltaic station

Construction progress, component areas and inspection records.

Photovoltaic and new energy application scenarios - wind power facilities

Application scenarios

Wind power facilities

Documentation around sites, roads and equipment.

Photovoltaic and new energy application scenarios - energy storage projects

Application scenarios

Energy storage project

Equipment layout, construction documentation and remote review.

Next step

Use a real project to verify photovoltaic and new energy solutions

Submit the project scope, existing equipment and outcome requirements and we will provide acquisition, reconstruction and delivery recommendations.